ข่าวแจ้งตลาดหลักทรัพย์
Advance in operation of HCU of the Refinery
TRANSLATION
No. 1000/158/2009
September 16, 2009
Subject : Advance in operation of HCU of the Refinery
Attention : President of The Stock Exchange of Thailand
On May 21, 2009, The Bangchak Petroleum Public Company Limited (the
"Company") informed that the Hydrocracking Unit, a part of the Product Quality
Improvement Project (PQI), was shutdown to repair the pump and valve control
system damaged during the commissioning process.
Presently, the control system equipments have been changed. The Hydrocracking
Unit has been in operating for a while, and it can continue normal operations
and refine crude feed as planned.
Please be informed accordingly.
Yours sincerely,
-signed-
(Mr.Anusorn Sangnimnuan)
President
Office of the Secretary to Board of Directors
Tel : 0-2335-4584
Fax : 0-2713-9419